HomeCategoriesBetween waterways, highways and future proof dikes — the invisible work of...

Between waterways, highways and future proof dikes — the invisible work of land surveyors

Have you ever noticed someone in a bright orange vest standing at the roadside, peering through a tall device set up on three legs? Or have you spotted neon markings on the ground, circling seemingly random metal points? If so, you might have encountered a land surveyor or the traces they left at their workplace. In other words, you witnessed one of the oldest sciences in human history, a discipline that remains indispensable for any spatial planning project to this day.

Why don’t we just use existing maps?

Land surveying is, simply put, the science of determining positions of physical features on the Earth’s surface. Now the outsider may think: What do we need land surveying for if the whole world in map format is accessible via navigation apps?

First, most maps are not as precise as we might think. While they can indeed guide us to the right place, the possible deviation up to a few meters makes it impossible to use them for constructing a highway or defining property boundaries. It could result in the street running into nowhere, missing connections to other routes, or entering private property such as a farmer’s fields. Maps are not millimeter-precise simply because the more precise it gets, the more time and labour-intensive it becomes. In most cases, this effort is unnecessary, as maps are designed to provide a generalized picture of a place for navigation purposes. This simplification results in streets appearing slightly straightened, property boundaries being less precise, and smaller features being omitted.

Next, land surveyors do not only observe static conditions. Changes in both built and natural environments, such as altered water levels or houses becoming crooked due to  earthquakes, are just two examples of dynamic processes that demand the professional work of a land surveyor.
 Last but not least, land surveyors do not only use X and Y coordinates, which show the position of a point on the ground, but also work with height, underground and underwater measurements.

Millimeter precision in infrastructure planning and house construction

Infrastructure planning and house construction often require the precise work of a land surveyor. Here, they provide the important link between an engineer’s plan and the construction workers building the final object. For example, the southern ring road of Groningen, an important highway that leads traffic around the city, was built after surveyors determined the exact location where it needed to be. Wrong measurements could have led to underpasses at the wrong place or the ring road not connecting perfectly with the subsequent highways around the east and west of the city. Another exact measurement needed to be taken after construction was finished, to ensure that everything was in the right place and the right size. 

Regarding house construction, surveying involves confirming property boundaries, which must be precisely maintained before building a new house. If measurements are only a few centimeters off, a building can, for example, end up standing on foreign property or fail to comply with the maximum height allowed. In the worst case, if the door is built on the wrong side of the house or the house on the wrong side of the street, complete demolitions can be the consequence. For minor insufficiencies, fees may be required.

Determining Groninger’s right to earthquake compensations 

The province of Groningen occasionally experiences small earthquakes as a consequence of gas extraction that ceased only in 2024. Even though most eruptions can not even be felt, several houses, especially in the north and northeast of the province, show traces of them. Small cracks or a tilt to one side can lead to instability, potentially entitling the owner to financial compensation or even requiring the demolition and reconstruction of houses. These conditions need to be identified first by a land surveyor, who can detect changes in a house’s angle via a 3D scan. This method involves directing  laser pulses towards the house, and the time it takes for them to return is measured to determine the distance. The result is a very precise 3D model of the house, and by repeating the measurement at a later time, changes between the two developed models can be detected. It is not land surveyors but construction experts who are responsible for detecting cracks in houses.

Surveying in the waterways of the Netherlands 

Measurement Point on the sidewalk (image by author)

Beyond ensuring accuracy at construction sites and monitoring the tilt of houses, land surveyors further carry out their work in cow pastures and meadows, and on or in canals, lakes, and rivers. The latter means either taking measurements from a boat or wading directly into the water, in which case chest waders (waterproof overalls with integrated boots) help to stay dry. Sludge levels in rivers and canals need to be measured regularly to ensure proper water flow. To do this, the surveyor submerges a stick with a GPS attached to its end underwater. Based on these measurements, excess sludge can be removed before it causes problems such as reduced water drainage, which can cause flooding in the case of strong rainfall, or decreased water depth which can disturb the navigation of boats and ships. Also related to water management, the Hoogwaterbeschermingsprogramma (HWBP) aims to reinforce all dikes in the Netherlands for improved climate resilience. Following the construction or reinforcement of new dikes along the IJsselmeer and Markermeer, the lakebeds must be measured regularly during and after construction to detect areas where the dikes are deteriorating too quickly and to monitor how water levels and dike heights remain properly aligned over time. Thus, this work will continue as long as water levels change and dykes defy the forces of nature.

The secret behind metal stakes on the ground

GPS is a commonly known navigation system that surveyors use. It can achieve centimeter-level accuracy, making it suitable for tasks such as monitoring sludge accumulation or water levels. GPS determines a position by measuring its distance to multiple satellites orbiting the Earth. 

Total Station standing above a measurement point (image by author)

However, many projects require millimeter-level precision, which leads us to a concept dating back to the 16th century: triangulation. This method is based on the idea that if the lengths and angles of a triangle are known, it can be used as a starting point to calculate other positions.

Instead of relying solely on GPS, land surveyors use known height points to derive a more precise location through triangulation. There are countless of these static points spread across the Netherlands, with their positions recorded in the Dutch coordinate system. Often, they are located at churches or houses, as those usually don’t change location. After determining an initial GPS location, the surveyor uses a total station, the tall device mentioned in the beginning, to measure the distance and angle towards two height points and determine a millimeter precise location.

Yet, these height points differ from the metal stakes on the ground, which can be seen at almost every corner for those observing with a keen eye. These possess complete X, Y and Z coordinates, displaying position and height, and are placed by land surveyors, after having determined a precise position. This is useful when new projects, such as the construction of a road, begin, as the same coordinates need to be used over a longer period of time. Starting from there, new points can be established step by step, or point by point, allowing entire areas to be mapped with high precision. The neon marks around the points simply help locate them more easily and the number is usually a code, by which the surveyor can recognize which point it is. 

No matter the method, these precise coordinates derived and used by surveyors form the foundation for a wide range of spatial planning matters, from measuring surface areas to determining heights, from static to dynamic environments, across landscapes and through domains such as infrastructure development or climate change adaptation. This broad field of work has always been, and will remain, crucial for the Netherlands as a country widely known for its expertise in spatial planning. Particularly regarding water management, it raises the question of which challenges the Netherlands will face in terms of climate change and the role land surveyors will play addressing them. Nonetheless, it is also the more tangible projects, such as infrastructure planning or housing construction, where a land surveyor will always remain indispensable.

Sources / References


Interview with a Landsurveyor
 from Groningen

https://universidadeuropea.com/en/blog/what-does-land-surveyor-do/ https://www.volandis.nl/media/2429/landmeter-9917.pdf


https://www.ingenieur.de/technik/fachbereiche/bau/geschichte-der-landvermessung-vom-seilspanner-zum-gps

https://equatorstudios.com/land-and-topographic-survey/land-surveying-accuracy/

https://www.faro.com/de-DE/Resource-Library/Article/Land-Surveying-The-Modern-Art-of-Accurate-Measurement

https://courses.ems.psu.edu/natureofgeoinfo/print/c5.html

RELATED ARTICLES

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.